loading
Papers Papers/2022 Papers Papers/2022

Research.Publish.Connect.

Paper

Paper Unlock

Authors: Mona Asudegi and Ali Haghani

Affiliation: University of Maryland at College Park, United States

Keyword(s): Project Management, Dynamic Scheduling, Resource Constraints, Construction Equipment, Optimization.

Related Ontology Subjects/Areas/Topics: Applications ; Artificial Intelligence ; Enterprise Information Systems ; Information Systems Analysis and Specification ; Knowledge Discovery and Information Retrieval ; Knowledge-Based Systems ; Methodologies and Technologies ; Operational Research ; Optimization ; Pattern Recognition ; Project Management ; Resource Allocation ; Scheduling ; Software Engineering ; Symbolic Systems

Abstract: Major portion of projects’ cost is dedicated to construction equipment’s costs which signify the importance of employing optimal equipment’s schedules in projects. In this paper the problem of construction equipment scheduling for a company with several ongoing projects in different regions is studied. The goal is scheduling heavy construction equipment and their assignments to jobs so that the total cost for the company and disruptions in projects’ schedules is minimized while considering the priorities and critical paths of the projects. A robust predictive-reactive integer model with a hybrid dynamic approach is employed in modeling the problem. Case studies showed considerable savings in cost and minimizing disruption in schedules in real time.

CC BY-NC-ND 4.0

Sign In Guest: Register as new SciTePress user now for free.

Sign In SciTePress user: please login.

PDF ImageMy Papers

You are not signed in, therefore limits apply to your IP address 18.223.107.124

In the current month:
Recent papers: 100 available of 100 total
2+ years older papers: 200 available of 200 total

Paper citation in several formats:
Asudegi, M. and Haghani, A. (2013). A Predictive-Reactive Dynamic Scheduling under Projects’ Resource Constraints for Construction Equipment. In Proceedings of the 2nd International Conference on Operations Research and Enterprise Systems - ICORES; ISBN 978-989-8565-40-2; ISSN 2184-4372, SciTePress, pages 334-337. DOI: 10.5220/0004287003340337

@conference{icores13,
author={Mona Asudegi. and Ali Haghani.},
title={A Predictive-Reactive Dynamic Scheduling under Projects’ Resource Constraints for Construction Equipment},
booktitle={Proceedings of the 2nd International Conference on Operations Research and Enterprise Systems - ICORES},
year={2013},
pages={334-337},
publisher={SciTePress},
organization={INSTICC},
doi={10.5220/0004287003340337},
isbn={978-989-8565-40-2},
issn={2184-4372},
}

TY - CONF

JO - Proceedings of the 2nd International Conference on Operations Research and Enterprise Systems - ICORES
TI - A Predictive-Reactive Dynamic Scheduling under Projects’ Resource Constraints for Construction Equipment
SN - 978-989-8565-40-2
IS - 2184-4372
AU - Asudegi, M.
AU - Haghani, A.
PY - 2013
SP - 334
EP - 337
DO - 10.5220/0004287003340337
PB - SciTePress