We consider a single-machine scheduling problem, in which the processing time of a job can take any value from a given segment. The criterion is to minimize the sum of weighted completion times of the n jobs, a weight being associated with a job. For a job permutation, we study the stability box, which is a subset of the stability region. We derive an O(nlogn) algorithm for constructing a job permutation with the largest dimension and volume of a stability box. The efficiency of a permutation with the largest dimension and volume of a stability box is demonstrated via a simulation on a set of randomly generated instances.
References
- Daniels, R. and Kouvelis, P. (1995). Robust scheduling to hedge against processing time uncertainty in single stage production. Management Science, V. 41(2):363- 376.
- Kasperski, A. (2005). Minimizing maximal regret in the single machine sequencing problem with maximum lateness criterion. Operations Research Letters, V. 33:431-436.
- Kasperski, A. and Zelinski, P. (2008). A 2-approximation algorithm for interval data minmax regret sequencing problem with total flow time criterion. Operations Research Letters, V. 36:343-344.
- Lai, T.-C. and Sotskov, Y. (1999). Sequencing with uncertain numerical data for makespan minimization. Journal of the Operations Research Society, V. 50:230- 243.
- Lai, T.-C., Sotskov, Y., Sotskova, N., and Werner, F. (1997). Optimal makespan scheduling with given bounds of processing times. Mathematical and Computer Modelling, V. 26(3):67-86.
- Pinedo, M. (2002). Scheduling: Theory, Algorithms, and Systems. Prentice-Hall, Englewood Cliffs, NJ, USA.
- Sabuncuoglu, I. and Goren, S. (2009). Hedging production schedules against uncertainty in manufacturing environment with a review of robustness and stability research. International Journal of Computer Integrated Manufacturing, V. 22(2):138-157.
- Slowinski, R. and Hapke, M. (1999). Scheduling under Fuzziness. Physica-Verlag, Heidelberg, Germany, New York, USA.
- Various optimizers for single-stage Naval Research Logistics Quarterly, Smith, W. (1956). production. V. 3(1):59-66.
- Sotskov, Y., Egorova, N., and Lai, T.-C. (2009). Minimizing total weighted flow time of a set of jobs with interval processing times. Mathematical and Computer Modelling, V. 50:556-573.
- Sotskov, Y., Egorova, N., and Werner, F. (2010a). Minimizing total weighted completion time with uncertain data: A stability approach. Automation and Remote Control, V. 71(10):2038-2057.
- Sotskov, Y. and Lai, T.-C. (2011). Minimizing total weighted flow time under uncertainty using dominance and a stability box. Computers & Operations Research. doi:10.1016/j.cor.2011.02.001.
- Sotskov, Y., Sotskova, N., Lai, T.-C., and Werner, F. (2010b). Scheduling under Uncertainty. Theory and Algorithms. Belorusskaya nauka, Minsk, Belarus.
- Sotskov, Y., Wagelmans, A., and Werner, F. (1998). On the calculation of the stability radius of an optimal or an approximate schedule. Annals of Operations Research, V. 83:213-252.
Paper Citation
in Harvard Style
N. Sotskov Y., G. Egorova N., Lai T. and Werner F. (2011). THE STABILITY BOX IN INTERVAL DATA FOR MINIMIZING THE SUM OF WEIGHTED COMPLETION TIMES . In Proceedings of 1st International Conference on Simulation and Modeling Methodologies, Technologies and Applications - Volume 1: SIMULTECH, ISBN 978-989-8425-78-2, pages 14-23. DOI: 10.5220/0003574400140023
in Bibtex Style
@conference{simultech11,
author={Yuri N. Sotskov and Natalja G. Egorova and Tsung-Chyan Lai and Frank Werner},
title={THE STABILITY BOX IN INTERVAL DATA FOR MINIMIZING THE SUM OF WEIGHTED COMPLETION TIMES},
booktitle={Proceedings of 1st International Conference on Simulation and Modeling Methodologies, Technologies and Applications - Volume 1: SIMULTECH,},
year={2011},
pages={14-23},
publisher={SciTePress},
organization={INSTICC},
doi={10.5220/0003574400140023},
isbn={978-989-8425-78-2},
}
in EndNote Style
TY - CONF
JO - Proceedings of 1st International Conference on Simulation and Modeling Methodologies, Technologies and Applications - Volume 1: SIMULTECH,
TI - THE STABILITY BOX IN INTERVAL DATA FOR MINIMIZING THE SUM OF WEIGHTED COMPLETION TIMES
SN - 978-989-8425-78-2
AU - N. Sotskov Y.
AU - G. Egorova N.
AU - Lai T.
AU - Werner F.
PY - 2011
SP - 14
EP - 23
DO - 10.5220/0003574400140023