Boon, B. H. and Sierksma, G. (2003). Team formation:
Matching quality supply and quality demand. Euro-
pean Journal of Operational Research, 148(2):277–
292.
Brown, G. G. and Graves, G. W. (1981). Real-time dis-
patch of petroleum tank trucks. Management Science,
27(1):19–32.
Brown, G. G. and Vassiliou, A. L. (1993). Optimizing disas-
ter relief: Real-time operational and tactical decision
support. Naval Research Logistics, 40(1):1–23.
Campbell, G. M. (1999). Cross-utilization of work-
ers whose capabilities differ. Management Science,
45(5):722–732.
Campbell, G. M. (2011). A two-stage stochastic program
for scheduling and allocating cross-trained workers.
The Journal of the Operational Research Society,
62(6):1038–1047.
Campbell, G. M. and Diaby, M. (2002). Development and
evaluation of an assignment heuristic for allocating
cross-trained workers. European Journal of Opera-
tional Research, 138(1):9–20.
Caron, G., Hansen, P., and Jaumard, B. (1999). The as-
signment problem with seniority and job priority con-
straints. Operations Research, 47(3):449–453.
Cattrysse, D. G. and Wassenhove, L. N. V. (1992). A
survey of algorithms for the generalized assignment
problem. European Journal of Operational Research,
60(3):260–272.
Felici, G. and Mecoli, M. (2007). Resource assignment with
preference conditions. European Journal of Opera-
tional Research, 180(2):519–531.
Fowler, J. W., Wirojanagud, P., and Gel, E. S. (2008).
Heuristics for workforce planning with worker differ-
ences. European Journal of Operational Research,
190(3):724–740.
Gilberti, D. and Righini, G. (2007). Optimization of du-
ties assignment in emergency services. In Service Op-
erations and Logistics, and Informatics, 2007, IEEE
International Conference on, Philadelphia, PA, pages
1–6.
Green, L. and Kolesar, P. (2004). Improving emergency re-
sponsiveness with management science. Management
Science, 50(8):1001–1014.
Jenkins, L. (2000). Selecting scenarios for environmental
disaster planning. European Journal of Operational
Research, 121(2):275–286.
Kolesar, P. and Walker, W. E. (1974). An algorithm for
the dynamic relocation of fire companies. Operations
Research, 22(2):249–274.
Kuhn, H. W. (1955). The Hungarian method for the assign-
ment problem. Naval Research Logistics Quarterly,
2(1-2):83–97.
Mazzola, J. and Neebe, A. (1986). Resource-constrained
assignment scheduling. Operations Research,
34(4):560–572.
Mete, H. O. and Zabinsky, Z. B. (2010). Stochastic op-
timization of medical supply location and distribution
in disaster management. International Journal of Pro-
duction Economics, 126(1):76–84.
Pentico, D. W. (2007). Assignment problems: A golden
anniversary survey. European Journal of Operational
Research, 176(2):774–793.
Rolland, E., Patterson, R., Ward, K., and Dodin, B. (2010).
Decision support for disaster management. Opera-
tions Management Research, 3(1):68–79.
Sayın, S. and Karabatı, S. (2007). Assigning cross-
trained workers to departments: A two-stage opti-
mization model to maximize utility and skill improve-
ment. European Journal of Operational Research,
176(3):1643–1658.
Shipley, M. F. and Johnson, M. (2009). A fuzzy approach
for selecting project membership to achieve cognitive
style goals. European Journal of Operational Re-
search, 192(3):918 – 928.
Simpson, N. C. and Hancock, P. G. (2009). Fifty years of
operational research and emergency response. Journal
of the Operational Research Society, 60(S1):126–139.
Spoerl, D. and Wood, R. (2004). A stochastic general-
ized assignment problem. Working paper, Department
of Operations Research, Naval Postgraduate School,
Monterey, California.
Toktas, B., Yen, J. W., and Zabinsky, Z. B. (2004).
A stochastic programming approach to resource-
constrained assignment problems. Stochastic Pro-
gramming E-Print Series, http://www.speps.org.
Toktas, B., Yen, J. W., and Zabinsky, Z. B. (2006). Ad-
dressing capacity uncertainty in resource-constrained
assignment problems. Computers & Operations Re-
search, 33(3):724–745.
Volgenant, A. (2004). A note on the assignment problem
with seniority and job priority constraints. European
Journal of Operational Research, 154(1):330–335.
Wirojanagud, P., Gel, E. S., Fowler, J. W., and Cardy, R.
(2007). Modelling inherent worker differences for
workforce planning. International Journal of Produc-
tion Research, 45(3):525–553.
Woodruff, C. J. (2010). Multivariate optimisation for pro-
curement of emergency services equipment - teams of
the best or the best of teams? European Journal of
Operational Research, 205(1):186–194.
Yi, W. and Kumar, A. (2007). Ant colony optimiza-
tion for disaster relief operations. Transportation Re-
search Part E: Logistics and Transportation Review,
43(6):660–672.
ManagementofEmergencyResponseTeamsunderStochasticDemands
19