KSF-CA Correlation Matrix for Probabilistic Cashflow Model on Construction Project Financing in South Korea
Jin-hyuk Yoo, Dong-gun Lee, Hee-sung Cha
2015
Abstract
In the construction industry, the main obstacle in successfully completing a project is a failure in identifying and responding the project risk factors. Especially for construction project financing (PF), many project practitioners are struggling in developing a cash-flow model by integrating the key risk factors for the subject project. This study has identified key success factors (KSFs) of construction project financing (PF) throughout an extensive literature review in collaboration with an industry survey. They have been further derived from Factor Analysis technique and qualified using Fuzzy-AHP method. Throughout the evaluation of the derived success factors in real building construction projects, a strong correlation has been identified between the score of each PF success factor and the level of success and/or expected rate of return (ROR). Using the result of this investigation, this study has been developing a correlation matrix for inter-relating each KSF and its corresponding cash account in order to effectively measure the financial viability of PF projects. With the help of this mechanism, the project stakeholders can reach more objective and transparent decision-making process. The contribution of this study will help decision makers of the PF project make a better decision and give a meaningful guidance in achieving more successful PF projects.
References
- Badu, E., Edwards, D. J, and Owusu-Manu, D. M. (2012)," Barriers to the implementation of innovative financing (IF) of infrastructure", Journal of Financial Management of Property and Construction, pp.253- 273.
- Cheng, C. H. (1996), "Evaluating naval tactical missile systems by fuzzy AHP based on the grade value of membership function", European Journal of Operational Research 96, pp .343-350.
- Jafarizadeh, B. (2010), “Financial factor models for correlated inputs in the simulation of project cash flows”, Journal of Petroleum Science and Engineering, 54-57.
- Kishore, V., Abraham, D. M., and Sinfield, J. V. (2011), "Portfolio Cash Assessment Using Fuzzy Systems Theory", Journal of Construction Engineering and Management, 2011.137:333-343.
- Kong, D., Tiong, R. L. K, Cheah, C. Y. J., Permana, A., and Ehrlich, M. (2008), "Assessment of Credit Risk in Project Finance", Journal of Construction Engineering and Management, 2008.134:876-884.
- Lam, K. C. Wang, D. and Lam, M. C. K.(2008), "Practices of Hong Kong building contractors in strategic asset allocation process: longitudinal approach", Journal of Financial Management of Property and Construction, pp. 176-186.
- Lee, D., Li, T., Arditi, D. (2012), "Stochastic Project Financing Analysis System for construction", Journal of Construction Engineering and Management, 2012.138:376-389.
- Li, J., and Zou, P. (2011), "Fuzzy AHP-Based Risk Assessment Methodology for PPP Projects", Journal of Construction Engineering and Management, 2011.137:1205-209.
- Lucko, G. (2011), "Optimizing Cash Flows for Linear Schedules Model with Singularity Functions by Simulated Annealing", Journal of Construction Engineering and Management, 2011.137:523-535.
- Odeyinka, H. A., Lowe, J., and.Kaka,,A. (2008), "An evaluation of risk factors impacting construction cash flow forecast", Journal of Financial Management of Property and Construction, pp. 5-17.
- Odeyinka, H. A., Lowe, J., and.Kaka,,A. (2012), "Regression modelling of risk impacts on construction cost flow forecast", Journal of Financial Management of Property and Construction, pp.203-221.
- Wibowo, A.and Kochendörfer, B. (2005), "Financial Risk Analysis of Project Finance in Indonesian Toll Roads, Journal of Construction Engineering and Management, 2005.131:963-972.
- Xu, Y., Chan, A. P. C., and Yeung, J. F. Y. (2010), "Developing a Fuzzy Risk Allocation Model for PPP Projects in china", Journal of Construction Engineering and Management 2010.136:894-903.
- Ye, S., Tiong, R. L. K. (2000), "NPV-at-Risk Method in Infrastructure Project Investment Evaluation", Journal of Construction Engineering and Management, 126(3), pp. 227-233.
Paper Citation
in Harvard Style
Yoo J., Lee D. and Cha H. (2015). KSF-CA Correlation Matrix for Probabilistic Cashflow Model on Construction Project Financing in South Korea . In Proceedings of the International Conference on Operations Research and Enterprise Systems - Volume 1: ICORES, ISBN 978-989-758-075-8, pages 383-388. DOI: 10.5220/0005253903830388
in Bibtex Style
@conference{icores15,
author={Jin-hyuk Yoo and Dong-gun Lee and Hee-sung Cha},
title={KSF-CA Correlation Matrix for Probabilistic Cashflow Model on Construction Project Financing in South Korea },
booktitle={Proceedings of the International Conference on Operations Research and Enterprise Systems - Volume 1: ICORES,},
year={2015},
pages={383-388},
publisher={SciTePress},
organization={INSTICC},
doi={10.5220/0005253903830388},
isbn={978-989-758-075-8},
}
in EndNote Style
TY - CONF
JO - Proceedings of the International Conference on Operations Research and Enterprise Systems - Volume 1: ICORES,
TI - KSF-CA Correlation Matrix for Probabilistic Cashflow Model on Construction Project Financing in South Korea
SN - 978-989-758-075-8
AU - Yoo J.
AU - Lee D.
AU - Cha H.
PY - 2015
SP - 383
EP - 388
DO - 10.5220/0005253903830388