Theoretical Analysis on Soft Soil Foundation Long-term Settlement
for Storage Yard Engineering
Wenbin Liu
1,2,3,4
1
Tianjin Port Engineering Institute Co., Ltd. Of CCCC First harbor engineering Co., Ltd., Tianjin, China
2
CCCC First Harbor Engineering Company Ltd., Tianjin, China
3
KeyLaboratory of Port Geotechnical Engineering, Ministry of Communications, PRC, Tianjin, China
4
Key Laboratory of Port Geotechnical Engineering of Tianjin,Tianjin, China
Keywords: Soft soil foundation, storage yard engineering, long-term settlement, in-site monitoring, theoretical
calculation.
Abstract: This paper analysed the long-term settlement of storage yard engineering located at Tianjin Nanjiang Port.
The long-term settlement was calculated based on “Code for Foundation of Port Engineering”, and the
predicted result is compared with the in-site monitoring data. The comparison results show that the long-
term settlement calculation results based on code should be modified before using for settlement prediction.
The modify factor is 1.1 to 1.3 for Tianjin area.
1 INTRODUCTION
The research on soft soil foundation settlement is a
hot topic and many scholars had done lots of work.
The two dimensional formulas of viscous elastic
BIOT's consolidation was established based on
MERCHANT's model(Tang, 2001). The settlement
development regular was analysed with specification
and one-dimensional consolidation theory(Zhou,
2009). The modulus of compression and
consolidation coefficient was also being
determined(Zhou, 2009). A back analysis on
consolidation coefficient with layer-wise summation
method and Terzaghi's one-dimensional
consolidation theory was proposed(Qin, 2012). The
variation regular of consolidation coefficient was
also analyzed and the prediction model for
calculating consolidation coefficient in different
situations was proposed(Qin, 2012). Hierarchical
structure model was replaced with shark fin figure in
research and analyzed 6 factors affecting long-term
settlement with Delphi and analytic hierarchy
process (AHP) method(Li, 2013).
This paper analyzed the long-term settlement
based storage yard engineering in Tianjin Nanjiang
Port. The long-term settlement was calculated based
on “Code for Foundation of Port Engineering”. The
in-site monitoring results were also used for
verifying the calculation results. The comparison
between calculation results and in-site test data
offers a simple way to optimize the code calculation
results for engineering practice.
2 ENGINEERING CASE
The case used in this paper is storage yard
engineering located at Tianjin Nanjiang port. The
specific parameters of foundation soil are listed in
Table 1. Table 2 shows the parameters of e-p curve
for each soil layers.
The vacuum load is 85 kPa, lasting for 120 days.
The construction load is 20 kPa, lasting for 10 days.
Table 2 Parameters of e-p curve for each soil layers.
Table 1 Parameters of foundation soil.
3 THEORETICAL ANALYSES
The Port engineering foundation calculation system
(2008) is used for calculating the long-term
settlement of this road engineering case. Figure 1
shows the calculation settlement and the final
settlement is 1.902 m.
Figure 1 Final settlement for the storage yard engineering.
The final settlement value according to
theoretical calculation method is 1.902 m, while the
in-site monitoring data shows that the final
settlement is 2.323m, 1.22 times as large as
calculation result. The major reason responding for
that is the calculation model according to theory
method is a one-dimensional consolidation model
and ignores the influence of others dimensions on
settlement. The influence of this assumption on
settlement calculation depends heavily on the soil
properties.
4 THEORY OPTIMIZATION
In order to modify the gap between code calculation
result and in-site test value, a modification factor is
used in predicting long-term settlement. The formula
for calculating final settlement is as follow.
isd
h
e
ee
mS
+
=
1i
2i1i
1
(1)
Where, symbol S
d
refers to final settlement of
soft soil foundation; m
s
is modification factor,
determining by the experiment or the empirical
equation; e
1i
and e
2i
respectively represents the void
ratio of its layer under average design value of self-
weight stress and average design value of final
stress. h
i
is the thickness of its soil layer.
The modification factor for Tianjin area usually
varies from 1.1 to 1.3.
5 CONCLUSIONS
The long-term settlement according to theoretical
calculation should be modified. The value of
modification factor is affected by the preloading
situation and foundation stiffness. The modification
factor for Tianjin area usually varies from 1.1 to 1.3.
The foundation with higher stiffness and exhibiting
lower preloading value needs a larger value of
modification factor.
ACKNOWLEDGEMENTS
The authors are grateful for the support provided by
Natural Science Foundation of Tianjin
(16JCQNJC07200)
REFERENCES
1. Tan C.M. 2001. Iterative back-analysis layer by layer
method to predict settlement of several layers soft clay
ground. China Journal of Highway and Transport,
14(4):28-32.
2. Zhou J. 2009.Prediction of foundation settlement of a
heap of ore-port under multi-stage loading during
period of use.Rock and Soil Mechanics, 30(7):2101-
2104.
3. Qin Z. H. 2012. Consolidation coefficient inversion of
seawall foundation and prediction of its post
construction settlement based on fractal theory, Rock
and Soil Mechanics, 33(6): 1747-1753.
4. Li S. H. 2013.Analysis of the Influencing Factors of
Post–construction Settlement on the Soft Foundation
of Sea Dike.Zhejiang Hydromechanics, (1): 54-57.