In order to do this, first, based on the eastern route of the South-to-North Water Diversion Project
in Shandong Province and the water diversion project such as Jiaodong Water Transfer Project, it
will promote the construction of the Shuhe Eastward Transfer Project. Plan Yihe-Shuhe flood
northward transfer project, to further improve the province's backbone network. The second is to
speed up the pace of regional water network construction, the implementation of reservoirs, rivers,
channels of connectivity. The third is to speed up the construction of water supply and drainage
network. Through the above project construction, the effect of complementing the backbone with the
regional water network will be achieved.
3.2. Strive to improve flood control, drought mitigation capacity
The ability to improve flood control, drought mitigation and disaster reduction needs to follow some
principles. For example, pay attention to disaster prevention while paying attention to prevention,
concerned about the impact of disasters and their causes, engineering and non-engineering measures
are combined. Therefore, we should continue to strengthen the weak links in flood control and
drought relief, raise the standard of urban flood control and drainage, comprehensively improve flood
control and drought relief capacity, and minimize flood and drought losses. Based on strengthening
dangerous waters, give prominence to river governance. We should give prominence to river training
based on the reinforcement of dangerous water areas such as reservoirs, ponds and sluices at risk. For
rivers in areas prone to densely populated areas and floods, there should be stronger governance. And
rivers with a catchment area above 200 square kilometers must meet the flood control standards set
by the state. Different conditions for the rivers and lakes, we have to take different control measures.
For example, science fortification, make the best use of the situation, according to local conditions to
take heightening reinforcement and new dikes, river dredging, river control, revetment slope
protection and other measures.
3.3. Efforts to build optimal allocation of water resources project
Completed on schedule South-North Water Transfer, Jiaodong water transfer project. Accelerate the
construction of supporting projects and a number of regional deployment of water projects, water
storage projects, rain and flood utilization projects. And as soon as possible to achieve the Yangtze
River water, the Yellow River water and the local surface water, groundwater optimal allocation and
joint scheduling. First of all, we must continue to promote water source construction. According to
the situation on the ground, respectively, in plains, hills, estuaries, the Gulf and other regions to
establish reservoirs. Second, we need to improve the water supply network project. In particular, we
should strengthen the urbanization of rural water supply and the integration of urban and rural water
supply. Finally, speed up the construction of water purification treatment project. According to the
characteristics of water sources and water quality throughout the province, the demand for
centralized water supply in cities and rural areas, the construction of water purification treatment
works to ensure the safety of drinking water and the optimal utilization of multiple water sources to
achieve "e xcellent water superiority".
4. Conclusions
Under the view of healthy city, the system of water system governance in Shandong Province is a
stage process of modern water conservancy development. Its goal is to strive through 10 years of
efforts to fundamentally reverse the construction of water conservancy in Shandong lags far behind
the economic and social development. We will earnestly guarantee the food security, economic
security, ecological security and social security in Shandong Province and basically realize the
modernization of water conservancy by 2020. In order to achieve the above objectives, the
foundation and core are efforts to strengthen the construction of modernized water networks.
IWEMSE 2018 - International Workshop on Environmental Management, Science and Engineering
32