Time Acceleration Analysis of the Kijing Terminal Development Project in Mempawah, West Kalimantan

Ineza Marpaung, Silvianita, Daniel Rosyid, Suntoyo

2019

Abstract

The cargo port is a port that is planned specifically for the purpose of loading and unloading of goods and is equipped with a warehouse for storing goods and cranes to move cargo ship. With the construction of the port, the company needs a good project management design. The mismatch between the schedule design and the reality on the ground still creates problems. This is a challenge for a project manager who must carefully look at existing activities to avoid delays in the project. To overcome this problem, it is necessary to maximize performance by reducing the duration of each activity in the project that still includes safety time. This paper analyzes the acceleration of the duration of the Kijing terminal construction project in Mempawah West Kalimantan using the Precedance Diagramming Method (PDM) method, as well as the Monte Carlo method to find out the project's probability on time, then find the optimal duration with the Time Cost Trade Off (TCTO) method. From the results of the analysis with the PDM method obtained 12 activities that exist on the critical path. Based on the Monte Carlo simulation, the results show that the probability of the project to be completed on time is 55% or 45% chance of being late. The optimum duration and costs on the critical path are obtained at the addition of 1 hour of overtime. The total duration of the project, which was originally 595 days to 513 days with a difference of 82 days, with a total cost of Rp2,740,269,901,670 to Rp2,740,775,765,420 with a difference of Rp505,863,750 and also a cost slope of Rp 6,169,070 per day.

Download


Paper Citation


in Harvard Style

Marpaung I., Silvianita., Rosyid D. and Suntoyo. (2019). Time Acceleration Analysis of the Kijing Terminal Development Project in Mempawah, West Kalimantan. In Proceedings of the 7th International Seminar on Ocean and Coastal Engineering, Environmental and Natural Disaster Management - Volume 1: ISOCEEN, ISBN 978-989-758-516-6, pages 122-130. DOI: 10.5220/0010057801220130


in Bibtex Style

@conference{isoceen19,
author={Ineza Marpaung and Silvianita and Daniel Rosyid and Suntoyo},
title={Time Acceleration Analysis of the Kijing Terminal Development Project in Mempawah, West Kalimantan},
booktitle={Proceedings of the 7th International Seminar on Ocean and Coastal Engineering, Environmental and Natural Disaster Management - Volume 1: ISOCEEN,},
year={2019},
pages={122-130},
publisher={SciTePress},
organization={INSTICC},
doi={10.5220/0010057801220130},
isbn={978-989-758-516-6},
}


in EndNote Style

TY - CONF

JO - Proceedings of the 7th International Seminar on Ocean and Coastal Engineering, Environmental and Natural Disaster Management - Volume 1: ISOCEEN,
TI - Time Acceleration Analysis of the Kijing Terminal Development Project in Mempawah, West Kalimantan
SN - 978-989-758-516-6
AU - Marpaung I.
AU - Silvianita.
AU - Rosyid D.
AU - Suntoyo.
PY - 2019
SP - 122
EP - 130
DO - 10.5220/0010057801220130