Design of Budget Carry Forward Process in Funds Management Module
with SAP using SAP Activate Methodology:
Case Study - PT. Telekomunikasi Indonesia, Tbk
Rizki Anik Tia
1
, Warih Puspitasari
1
and Wahjoe Witjaksono
1
1
Information System, School of Industrial and System Engineering, Telkom University, Indonesia
Keywords:
ERP, SAP, Funds Management, Budget Carry Forward, SAP Activate, Reporting
Abstract:
PT. Telkom is a company engaged in telecommunications providers in Indonesia. In the System, Application
and Product in Data Processing (SAP) funds management module in PT. Telkom has a problem with the budget
carry forward process. SAP reporting in PT. Telkom budget carry forward process nowadays, can only bring
the burden of expenses to the next fiscal year, while the budget cannot be carried away. The implementation of
the budget carry forward is carry out in accordance with the user’s requirement, which in SAP reporting can
transfer cost and budget expenses simultaneously to the next fiscal year. In this research using SAP Activate
methodology which consists of several stages: discover, prepare, explore, realize and deploy. The conclusion
of the research concludes the design plan of the budget carry forward in funds management module using SAP
Activate methodology which can separate reporting on the budget carry forward and budget carry over.
1 INTRODUCTION
The implementation of information systems in an or-
ganization is one of the most important things to help
solve problems in managing a company’s business
transactions. PT. Telkom is a State-Owned Enter-
prise (BUMN) engaged in telecommunications ser-
vices and networks in Indonesia. According to the
Telkom Indonesia Annual Report in 2014, the major-
ity shareholders of PT Telkom is the Government of
the Republic of Indonesia amounted to 52.56% and
the remaining 47.44% was controlled by the public.
The Company’s shares are traded on the Indonesia
Stock Exchange (IDX) and the New York Stock Ex-
change (NSYSE). The government acts as a regulator
that makes, monitors and enforces regulations relat-
ing to the telecommunications sector (Annual Report
PT Telkom, 2014).
The selection of the System Application and Prod-
uct in Data Processing (SAP) software as an Enter-
prise Resource Planning (ERP) based solution at PT.
Telkom is based on complexity and excellence com-
pared to other ERP software (Parven and Maimani,
2014) . PT. Telkom is the first state-owned company
to implement SAP since 2002. In this research will fo-
cus on discussing the implementation of SAP Finance
in the Funds Management module in PT Telkom.
The implementation of SAP in funds management
module at PT. Telkom has several problems, called
the management of the Capital Expenditure (CAPEX)
budget, especially in the budget carry forward pro-
cess. Based on the PT. Telkom Annual Report in
2012, it was explained that the Board of Commission-
ers instructed the Board of Directors that the imple-
mentation of Capital Expenditure must pay attention
to the timeliness of procurement processes (Telkom,
2012). When carrying out the procurement process
where the purchase requisition has been carried out,
the purchase order and good receipt in the current fis-
cal year but the invoice and payment for the purchase
of goods are postponed and resumed until the next
fiscal year. Therefore, it is necessary to transfer the
budget (budget carry forward) from the current fiscal
year to the next fiscal year which is carried out at the
end of the closing of the book. But for now the SAP
application at PT. Telkom has not been able to move
the budget to the next fiscal year, only the cost of ex-
penses that can be carried over to the next fiscal year.
This resulted in a decrease in the budget for the next
fiscal year and resulted in a decrease in planning to
procure goods in the next fiscal year. In this time to
overcome this problem, the user must add the budget
manually so the budget can meet the increasing cost
burden in the next fiscal year. This can cause the clos-
110
Tia, R., Puspitasari, W. and Witjaksono, W.
Design of Budget Carry Forward Process in Funds Management Module with SAP using SAP Activate Methodology: Case Study - PT. Telekomunikasi Indonesia, Tbk.
DOI: 10.5220/0009865601100114
In Proceedings of the International Conference on Creative Economics, Tourism and Information Management (ICCETIM 2019) - Creativity and Innovation Developments for Global
Competitiveness and Sustainability, pages 110-114
ISBN: 978-989-758-451-0
Copyright
c
2020 by SCITEPRESS Science and Technology Publications, Lda. All rights reserved
ing process of the annual book to be longer.
In order to overcome this problem, PT. Telkom
wants the budget carry forward process in the SAP ap-
plication to transfer the budget according to the cost
burden carried out from the current fiscal year to the
next fiscal year automatically. In a report for budget
carry forward process can do budget screening which
has reached the stage of good receipt. The results of
all budget use each year can be seen and monitored
in the reporting budget usage in SAP. In addition, PT.
Telkom wants in reporting budget usage in SAP there
is a separation between budget carry forward and the
budget carry over. The research conducted will fo-
cus on answering requirements from users regarding
the problems of budget carry forward on SAP appli-
cations at PT. Telkom. Based on these problems, it is
necessary to design SAP module funds management,
especially in the process of budget carry forward can
be a solution to handle the process of transferring the
budget.
2 LITERATURE STUDY
2.1 Enterprise Resource Planning
Enterprise Resource Planning is a system that can in-
tegrate business processes in companies with a cen-
tralized data storage process (Suryalena, 2013). ERP
systems can help companies manage their business
processes to be more efficient by sharing information
with relevant parties (Mustafri et al., 2016) so the in-
formation received can be directly known (real-time)
(Rokhmaningsih et al., 2015). ERP systems can help
companies in financial accounting, sales and distri-
bution, purchasing, human resources and production
planning (Akbar and Juliastrioza, 2015).
2.2 System Application and Product in
Data Processing (SAP)
System Application and Product in Data Process-
ing is an ERP system that was founded in 1972 in
Mannheim, Germany by five former IBM employees
namely Hasso Plattner, Dietmar Hopp, Claus Wellen-
reuther, Klaus Tschira, and Hans - Werner Hektor.
SAP is a software developed to support an organi-
zation in carrying out its operational activities to be
more effective and efficient. SAP is integrated soft-
ware that can make it easy to share information be-
tween functional fields in the company (Putri et al.,
2017) The client-server architecture used by SAP R/3
can run on multiple computer platforms, including
UNIX and Windows NT. Change of client-server sys-
tem into a cloud (SAP S/4). Hardware / Database co-
design is one of the main pillars of success on the SAP
S/4 HANA platform for data management in modern
hardware (Sikka et al., 2013).
2.3 Material Management
Managing raw material purchases from suppliers and
handling raw material inventory from procurement to
raw materials ready to be distributed to customers
(Ridwan and Alam, 2018). Following are the steps
in SAP to carry out the procurement process:
1. Create purchase requisition
Purchase requisition is a document that is used to
make requests for goods or material to place or-
ders directly with vendors and supplies.
2. Create purchase order
Purchase order is a purchase document at prices
agreed with the vendor.
3. Create good receipt
Good receipt is a document of receipt of goods
based on the purchase order in the form of a re-
ceipt by the warehouse.
4. Create invoice
An invoice is a document that contains an invoice
that must be paid to the vendor based on the trans-
action made on the purchasing process.
2.4 Funds Management
Funds Management (FI-FM) is one part of the Fi-
nancial Accounting module. The purpose of Funds
Management is to budget all income and expenses
for each division in the company. In addition, Funds
Management has the benefit of controlling the com-
pany’s future fund transactions according to the dis-
tributed budget and stopping the budget that has ex-
ceeded the allocation limit. Integration between Ma-
terial Management and Funds Management, for ex-
ample, is monitoring the purchase requisition pro-
curement transactions through invoices (SAP, 2005).
In addition, the Funds Management module and Ma-
terial Management module for the procurement pro-
cess is also integrated with the Project System module
to make project planning. Here is Figure 1 the inte-
gration Funds Management module with Project Sys-
tem Module and Material Management module with
another module in SAP.
Design of Budget Carry Forward Process in Funds Management Module with SAP using SAP Activate Methodology: Case Study - PT.
Telekomunikasi Indonesia, Tbk
111
Figure 1: Integration module in SAP
2.5 Budget Carry Forward
Budget Carry Forward (BCF) is one of the processes
found in module fund management (FI- FM). The
budget carry forward is a process that occurs if a
transaction is required to continue the budget for com-
mitment and the remaining budget for the transaction
from the current fiscal year to the next fiscal year.
3 METHODOLOGY
In this study, the methodology used is SAP Activate
is a new methodology introduced by SAP compa-
nies where this methodology is used to implement
SAP software using the agile method. SAP Acti-
vate offers best practices that can improve the suc-
cess of SAP software implementation. SAP Activate
is a unique combination of best practice, methodol-
ogy, and guided configuration delivered with a ref-
erence solution (Singh, 2017). SAP Activate phases
which are carried out in this research are discovered,
prepare, explore, realize and deploy (Suryaman et al.,
2018). These phases of SAP Activate Methodology
are illustrated in the flow diagram as well as an expla-
nation in Figure 2.
Figure 2: SAP Activate Methodology
3.1 Discover
At the discover phase there is a project scoping. For
the environment in this study is PT. Telkom, espe-
cially in the SSO Finance Center division, there are
some problems with the budget carry forward pro-
cess. In this study for the project scoping stage is
divided into 3 scopes, consist of business process de-
sign refers to SAP best practices and company needs,
configuration design in SAP according to the target
business process, business process design can be im-
plemented and configuration can be well documented.
3.2 Prepare
In the prepare phase, it’s analyzing the business pro-
cess as is of the budget carry forward process and
setup and enablement the software. At this stage, the
process of finalizing the project plan is carried out and
preparing the system access used in the project.
3.3 Explore
In the explore phase, a business process design will
be implemented in the company and identifying the
solution that fit in SAP and gaps with the company
need solutions or fit-gap analysis
3.4 Realize
In the phase of realize, the SAP application will be
configured and tested for the SAP system that has
been configured.
3.5 Deploy
At this stage is the stage of transition to the new sys-
tem.
4 ANALYSIS
4.1 Fit/Gap Analysis
Figure 3: Fit/Gap Analysis.
Fit/gap analysis is used to compare and evaluate the
solution in the SAP system with the need solution
in budget carry forward process in PT. Telkom. The
following is the result of fit and gap analysis in the
budget carry forward process at PT. Telkom. Based
on Figure 3 is the Fit/gap analysis of the budget carry
forward process at PT. Telkom.
ICCETIM 2019 - International Conference on Creative Economics, Tourism Information Management
112
Information :
N: Needs are not met at all.
P: Needs are only partially fulfilled
F: Needs have been fulfilled.
4.2 Business Process to Be
Business To Be is a proposed business process of re-
searchers after analyzing, evaluating and designing
the system. The flow of budget carry forward pro-
cesses to be will be explained in Figure 4.
Figure 4: Business Process To Be
Budget carry forward process occurs by a request
to procure goods to the vendor. The processes run-
ning by the SAP application. The logistics depart-
ment makes a purchase requisition by recording the
material that you want to buy from the vendor. Then
the logistics will print purchase requisition. After the
purchase requisition document has been approved by
a logistic functional official, the purchase requisition
document will be released. And then the logistics
department will make a purchase order that lists the
price of the agreement with the vendor. After that, the
logistics department will print the purchase order, and
after the purchase order document is approved it will
be released by the functional logistics official. After
the goods have been sent by the vendor and enter the
company’s warehouse, the logistics department will
make a good receipt document. However, the invoice
from the purchase of goods is delayed until the next
fiscal year. As a result, must carry out a budget carry
forward process on the SAP application. Division that
carries a carry forward process is Finance division by
carrying out a budget carry forward and the burden
of the current fiscal year to the next fiscal year using
SAP. And then the finance division looks at the usage
budget report an ensures that the budget and cost of
expenses in the next fiscal year increase.
4.3 Configuration
At this stage, the configuration is related to module
funds management and create a report painter for the
reporting budget usage process. The configuration in
the module funds management is done by using the
implementation guide (IMG) help. The configuration
carried out in funds management module aims to ac-
tivate the budget carry forward process in SAP. Next
to make reporting on the budget usage is done by us-
ing the help of a report painter to add a budget carry
forward column, define data that supports the budget
carry forward process and display information that
can distinguish the results of purchase orders from
carry forward process and the purchase order of the
current fiscal year on SAP.
4.4 Customized Report
At this stage, it is customizing Original / Release Bud-
get Report on SAP by using the ABAP programming
language (Advanced Business Application Program-
ming) in accordance with the user’s request to add the
Carry Forward column and can filter the budget that
has reached the stage of good receipt. The result of
the customized Original / Release Budget Report as
shown in Figure 5.
Figure 5: Customized Report.
5 CONCLUSION
The design of the sap funds management module
in the budget carry forward process is carried out
based on an analysis of user requirements and busi-
ness process analysis contained in sap using the sap
activate methodology. This research using SAP Ac-
tivate methodology because SAP Activate methodol-
ogy supported by best practices so it can be simplified
and accelerate the implementation of the budget carry
forward at PT. Telkom.
Previously, the SAP implementation of the budget
carry forward process at PT. Telkom had not been able
to move the budget to the next fiscal year. The results
of this study are obtained from the design of the bud-
get carry forward process in the SAP application that
can transfer the budget in accordance with the cost
that has not been completed in the current fiscal year
to the next fiscal year automatically. Besides that, the
budget report in SAP has been produced which can
separate the carry forward and carry over budget types
so that it allows users to process budget data. In carry
Design of Budget Carry Forward Process in Funds Management Module with SAP using SAP Activate Methodology: Case Study - PT.
Telekomunikasi Indonesia, Tbk
113
forward column displays the budget that has reached
the stage of good receipt.
The research can be further clarified by making
financial reports (reporting) through customization in
SAP to make it easier to adjust to user needs.
REFERENCES
Akbar, R. and Juliastrioza, J. (2015). Penerapan enterprise
resource planning (erp) untuk sistem informasi pem-
belian, persedian dan penjualan barang pada toko emi
grosir dan eceran. Jurnal Nasional Teknologi dan Sis-
tem Informasi, 1(1):7–17.
Mustafri, A., Witarsyah, D., and Witjaksono, R. W. (2016).
Pengembangan odoo modul warehouse pada gudang
pt. tarumatex menggunakan metode rapid application
development. eProceedings of Engineering, 3(2).
Parven, M. and Maimani, K. (2014). A comparative study
between the different sectors using the erp software in
jeddah region-ksa. Life Science Journal, 11(3s).
Putri, Y., Ridwan, A. Y., and Witjaksono, R. W. (2017).
Pengembangan sistem informasi berbasis enterprise
resource planning modul purchasing (mm-pur) pada
sap dengan metode asap di pt. unggul jaya sejahtera.
Jurnal Rekayasa Sistem & Industri (JRSI), 3(04):108–
114.
Ridwan, A. Y. and Alam, P. F. (2018). Perancangan sistem
enterprise resource planning modul purchasing (mm-
pur) menggunakan aplikasi sap dengan metode sap ac-
tivate di pt. xyz. eProceedings of Engineering, 5(2).
Rokhmaningsih, Z., Ridwan, A. Y., and Witjaksono, R. W.
(2015). Perancangan sistem fixed asset management
berbasis openerp dengan metode soft system method-
ology (studi kasus: Rsud al ihsan) designing fixed as-
set management system based on openerp using soft
system methodology.
SAP, H. (2005). Sap library documentation funds manage-
ment.
Sikka, V., F
¨
arber, F., Goel, A., and Lehner, W. (2013). Sap
hana: The evolution from a modern main-memory
data platform to an enterprise application platform.
Proceedings of the VLDB Endowment, 6(11):1184–
1185.
Singh, V. (2017). Manage Your SAP Projects with SAP Acti-
vate: Implementing SAP S/4HANA. Packt Publishing
Ltd.
Suryalena (2013). Enterprise resource planning (erp) seba-
gai tulang punggung bisnis masa kini. Jurnal Aplikasi
Bisnis, 3(2).
Suryaman, B. M., Kusumasari, T. F., and Hediyanto, U. Y.
(2018). Enterprise resource planning system design
project system module using sap application with sap
activate methodology in pt xyz. In International Con-
ference on Information Technology, Engineering, Sci-
ence & its Applications.
Telkom, P. (2012). Annual report pt telkom tahun 2012.
ICCETIM 2019 - International Conference on Creative Economics, Tourism Information Management
114