Analysis of Project Time Performance during Covid-19 Pandemic on the Construction of Service Building at RSUD Gianyar by using the Earned Value Method

Made Sudiarsa, Wayan Sudiasa, Gede Wibawa

2021

Abstract

Construction projects are unique because project conditions are influenced by many factors, including environmental factors. Nowadays Indonesia is currently facing an outbreak of the Covid-19 virus. Project management has an increasing important role in the current construction field. Supervision and control process are one of project management functions. In this study, we want to learn further the construction performance due to the COVID-19 pandemic on the project Sanjiwani Building of RSUD Gianyar. The method which is used to evaluate the performance of the contractor from the beginning of the construction until the time of reporting the project is by using the Earned Value method (EVM). This method provides information about Schedule Varians (SV) and Schedule Performance Index (SPI) of the project in a reporting period, provide predictive information all the time for completion of work on performance indicators in reporting period. The results show that the overall performance in terms of time can be said to be good because from the beginning to the end of reporting, the SV value is positive and SPI > 1. The total estimated project completion schedule (EAC) is 385 days, 5 days faster than the original plan.

Download


Paper Citation


in Harvard Style

Sudiarsa M., Sudiasa W. and Wibawa G. (2021). Analysis of Project Time Performance during Covid-19 Pandemic on the Construction of Service Building at RSUD Gianyar by using the Earned Value Method. In Proceedings of the 4th International Conference on Applied Science and Technology on Engineering Science - Volume 1: iCAST-ES, ISBN 978-989-758-615-6, pages 492-498. DOI: 10.5220/0010948000003260


in Bibtex Style

@conference{icast-es21,
author={Made Sudiarsa and Wayan Sudiasa and Gede Wibawa},
title={Analysis of Project Time Performance during Covid-19 Pandemic on the Construction of Service Building at RSUD Gianyar by using the Earned Value Method},
booktitle={Proceedings of the 4th International Conference on Applied Science and Technology on Engineering Science - Volume 1: iCAST-ES,},
year={2021},
pages={492-498},
publisher={SciTePress},
organization={INSTICC},
doi={10.5220/0010948000003260},
isbn={978-989-758-615-6},
}


in EndNote Style

TY - CONF

JO - Proceedings of the 4th International Conference on Applied Science and Technology on Engineering Science - Volume 1: iCAST-ES,
TI - Analysis of Project Time Performance during Covid-19 Pandemic on the Construction of Service Building at RSUD Gianyar by using the Earned Value Method
SN - 978-989-758-615-6
AU - Sudiarsa M.
AU - Sudiasa W.
AU - Wibawa G.
PY - 2021
SP - 492
EP - 498
DO - 10.5220/0010948000003260