Key Artefacts in the Initial Phases of IT Project Management: Systematic Mapping Study
Oksana Nikiforova, Kristaps Babris, Megija Krista Miļūne, Navyasri Tanguturi, Óscar Pastor
2025
Abstract
Mistakes made during the initial phases of an IT project are often critical as they can have cascading effect that impact every following phase of the project, especially implementation. These mistakes can lead to increased costs, delays and potential project failure. The initial phases of IT project, such as planning, requirements gathering, and design, set the foundation for the entire project defining project objectives, requirements and scope and setting the direction for the entire project. The paper demonstrates the results of the systematic mapping study performed on the definition of the types of artefacts created during IT project management before the implementation, as it lays the foundation for effective project planning, avoiding common pitfalls and ensuring alignment with industry best practices.
DownloadPaper Citation
in Harvard Style
Nikiforova O., Babris K., Miļūne M., Tanguturi N. and Pastor Ó. (2025). Key Artefacts in the Initial Phases of IT Project Management: Systematic Mapping Study. In Proceedings of the 20th International Conference on Evaluation of Novel Approaches to Software Engineering - Volume 1: ENASE; ISBN 978-989-758-742-9, SciTePress, pages 773-781. DOI: 10.5220/0013471000003928
in Bibtex Style
@conference{enase25,
author={Oksana Nikiforova and Kristaps Babris and Megija Miļūne and Navyasri Tanguturi and Óscar Pastor},
title={Key Artefacts in the Initial Phases of IT Project Management: Systematic Mapping Study},
booktitle={Proceedings of the 20th International Conference on Evaluation of Novel Approaches to Software Engineering - Volume 1: ENASE},
year={2025},
pages={773-781},
publisher={SciTePress},
organization={INSTICC},
doi={10.5220/0013471000003928},
isbn={978-989-758-742-9},
}
in EndNote Style
TY - CONF
JO - Proceedings of the 20th International Conference on Evaluation of Novel Approaches to Software Engineering - Volume 1: ENASE
TI - Key Artefacts in the Initial Phases of IT Project Management: Systematic Mapping Study
SN - 978-989-758-742-9
AU - Nikiforova O.
AU - Babris K.
AU - Miļūne M.
AU - Tanguturi N.
AU - Pastor Ó.
PY - 2025
SP - 773
EP - 781
DO - 10.5220/0013471000003928
PB - SciTePress