pool height 5 meters; pool length 25 meters; with
the number of pools as many as 1 (one) pool. this
producing a settling pond capacity of 2,500 m
2
.
The capacity of the mini kola can connect the total
discharge of water entering the mine site for a
period of 1 hour, which is 2,375 m
3
/hour.
REFERENCES
Asdak. Chay, Hidrologi dan Pengelolaan Daerah Aliran
Sungai, Yogyakarta: Gadjah Mada University, 2002.
Budiarto and A. D. Putranto, Perencanaan Tambang,
Surabaya: Institut Teknologi Adhi Tama Surabaya,
2015.
Budiarto, Hidrogeologi, Yogyakarta: FTM-UPN Veteran
Yogyakarta, 2008.
D. Hamid, "Prospek Pengembangan Industri Bahan Galian
Golongan C (Pasir dan Batuan Kerikil) di Kabupaten
Kampar," JOM Fekon, vol. 4, no. 1, pp. 66-78, 2017.
D. Saputra, M. Asof and E. W. D. H., "Rancangan Teknis
Penambangan Batubara di Blok Selatan PT. Dizamatra
Powerindo Lahat Sumatera Selatan," Jurnal Ilmu
Teknik, vol. 2, no. 3, 2014.
Gumbel, E.J. 1954. Statistic Theory of Extreme Values and
Some Practical Applications. Applied Mathematics
Series 33 (1st Ed). Departement of Commerce.
National Bereau on Standards.
Gutama. R. Sayoga, Diktat Kuliah Sistem Penyaliran
Tambang, Bandung: Institut Teknologi Bandung, 1999.
Haryanto, S. E., Budiarto, B., Sari, A. S., & Widiatmoko,
F. R. (2019, September). Kajian Teknis Sistem
Penyaliran Tambang Dan Rancangan Sumuran Pada Pit
Majapahit PT. Prolindo Cipta Nusantara, Kabupaten
Tanah Bumbu, Kalimantan Selatan. In Prosiding
Seminar Nasional Sains dan Teknologi Terapan (Vol.
1, No. 1, pp. 539-544).
Huissman. L., Sedimentation and Flotation Mechanical
Filtration, Delft: Delft University of Technology,
1977.
Intan. Suryani, "Rancangan Sistem Penyaliran Tambang
Terbuka PT. Mitra Bara Adiperdana Tbk, Desa Long
Loreh, Kecamatan Malinau Selatan, Kabupaten
Malinau Kalimantan Utara," Institut Teknologi Adhi
Tama Surabaya, Surabaya, 2019.
Krussman. G. P. and Ridder. N. A., Analysis and
Evaluation of Pumping Test Data, Wegeningen:
International Institute for Land Reclamation and
Improvement, 1970.Loebis. J., Banjir Rencana Untuk
Bangunan Air, Jakarta: Departemen Pekerjaan Umum,
Badan Penerbit Pekerjaan Umum, 1987.
Manning. J. C., Applied Principles of Hydrology, New
York: Merill Publishing Company, 1987.
Nurhakim, Bahan Kuliah Teknik Pertambangan, Kotabaru:
Progam Studi Teknik Pertambangan Universitas
Lambung Mangkurat, 2004.
Sari, A. S., & Saputro, A. F. (2021). Sistem Penyaliran
Tambang Terbuka pada Penambangan Batu Andesit.
Katalog Buku Karya Dosen ITATS, 1, 81-98.
Sari, A. S., & Saputro, A. F. (2021). KAJIAN SISTEM
HIDROGEOLOGI DAN RANCANGAN MINE
DRAINAGE PT. BUKIT KALISARI ARTA
MAKMUR KAB. SITUBONDO PROVINSI JAWA
TIMUR. Jurnal
Sumberdaya Bumi Berkelanjutan (SEMITAN), 3(1), 31-35.
S. Fauziah, S. and S., "Analisis Karakteristik dan Intensitas
Hujan Kota Surakarta," e-Jurnal Matriks Teknik Sipil,
vol. III, no. 2, pp. 82-89, 2013.
S. Awang, Perencanaan Sistem Penyaliran Tambang,
Bandung: Universitas Islam Bandung, 2004.
S. Suyono and K. Takeda, Hidrologi untuk Pengairan,
Jakarta: PT. Prandya Paramita, 1983.
Waterman. Sulistyana, Perencanaan Tambang,
Yogyakarta: UPN Veteran Yogyakarta, 2010.
Y. Khairuddin, D. and A. A. Budiman, "Sistem Penyaliran
Tambang Pit Ab Eks Pada PT. Andalan Mining Jobsite
Kaltim Prima Coal Sangatta Kalimantan Timur,"
Jurnal Geomine, vol. III, no. 3, 2015.