An important goal in schedule production orders through a manufacturing facility is to assure that the work is completed as close as possible to its due date. Work that is late creates downstream delays, while early completion can be detrimental if storage space is limited. Production planning and control manufacturing is becoming more difficult as family products increase and quantity decreases. This paper presents an ongoing information system development that aims the production planning of special test tables equipment for automobile components manufacturers. The simulated based information system will be used to support planning and schedule activities; to compare and analyze the impact of planning rescheduling; to forecast the production completion date; to detect bottlenecks and to evaluate machines performance.

References

  1. Azevedo, A.L. and Sousa J.P. (2000). Order Planning For Networked Make-To-Order Enterprises-A Case Study. Journal of the Operational Research Society, Volume 51, Issue 10, October 2000.
  2. Azevedo, A. and Moreira, A. (2003). Requirements of a Decision Support System for Capacity Analysis and Planning in Enterprise Networks. Proceedings of the ICEIS'03 - International Conference on Enterprise Information Systems, Volume 2, 177-184. France.
  3. Booch, G., Rumbaugh, J. and Jacobson, I. (1999). The Unified Modeling Language User Guide, Addison Wesley.
  4. Choi, S. D., Kumar, A. R. and Houshyar A. (2002). A simulation study of an automotive foundry plant manufacturing engine blocks, Proceedings of the 2002 Winter Simulation Conference, E. Yücesan, C.H. Chen, J.L. Snowdon, amnd J.M. Charnes, eds, San Diego, CA, December, 1035-1040. IEEE, Pistcataway, New Jersey.
  5. New, S.J., Lockett, A.G. and Boaden, R.J. (1991). Using Simulation in Capacity Planning, Journal of the Operational Research Society, Vol. 42, No. 4, pp 271- 279.
  6. Roman, D.B. and del Valle, A.G. (1996). Dynamic assignation of due dates in an assembly shop based in simulation, International Journal of Production Research, Vol. 34, No. 6, 1539-1554
  7. Sommerville, I. and Sawyer, P. (1997). Requirements Engineering: A Good Practice Guide, John Wiley & Sons. Chichester.
  8. Srivatson, N. and Kempf, K. (1995). Effective modelling of factory throughput times, Proceedings of the 1995 IEEE/CPMT International Electronics Manufacturing Technology Symposium, IEEE 1995
  9. Wortmann, J.C, Muntslag, D.R. and Timmermans, P.J.M. (1997). Customer-Driven Manufacturing. Chapman & Hall
Download


Paper Citation


in Harvard Style

Proença H. and Azevedo A. (2004). ORDER PLANNING DECISION SUPPORT SYSTEM FOR CUSTOMER DRIVEN MANUFACTURING: OVERVIEW OF MAIN SYSTEM REQUIREMENTS . In Proceedings of the Sixth International Conference on Enterprise Information Systems - Volume 2: ICEIS, ISBN 972-8865-00-7, pages 417-422. DOI: 10.5220/0002653404170422


in Bibtex Style

@conference{iceis04,
author={Henrique Proença and Américo Azevedo},
title={ORDER PLANNING DECISION SUPPORT SYSTEM FOR CUSTOMER DRIVEN MANUFACTURING: OVERVIEW OF MAIN SYSTEM REQUIREMENTS},
booktitle={Proceedings of the Sixth International Conference on Enterprise Information Systems - Volume 2: ICEIS,},
year={2004},
pages={417-422},
publisher={SciTePress},
organization={INSTICC},
doi={10.5220/0002653404170422},
isbn={972-8865-00-7},
}


in EndNote Style

TY - CONF
JO - Proceedings of the Sixth International Conference on Enterprise Information Systems - Volume 2: ICEIS,
TI - ORDER PLANNING DECISION SUPPORT SYSTEM FOR CUSTOMER DRIVEN MANUFACTURING: OVERVIEW OF MAIN SYSTEM REQUIREMENTS
SN - 972-8865-00-7
AU - Proença H.
AU - Azevedo A.
PY - 2004
SP - 417
EP - 422
DO - 10.5220/0002653404170422