TWO-SIDED ASSEMBLY LINE - Estimation of Final Results
Waldemar Grzechca
2008
Abstract
The paper considers simple assembly line balancing problem and two-sided assembly line structure. In the last four decades a large variety of heuristic and exact solutions procedures have been proposed to balance one-sided assembly line in the literature. Some heuristic were given to balance two-sided lines, too. Some measures of solution quality have appeared in line balancing literature: balance delay (BD), line efficiency (LE), line time (LT) and smoothness index (SI). These measures are very important for estimation the balance solution quality. Author of this paper modified and discussed the line time and smoothness for two-sided assembly line. Some problems, which appeared during evaluations, are mentioned.
References
- Bartholdi J.J., 1993. Balancing two-sided assembly lines: a case study, International Journal of Production Research, 23, 403-421
- Baybars, I., 1986. A survey of exact algorithms for simple assembly line balancing problem, Management Science, 32, 11-17
- Eral, Erdal, Sarin S.C., 1998. A survey of the assembly line balancing procedures, Production Planning and Control, 9, 34-42
- Forteca D.J., Guest C.L., Elam M., Karr C.L., 2005. A fuzzy logic approach to assembly line balancing, Mathare & Soft Computing, 57-74
- Gutjahr, A.L., Neumhauser G.L., 1964, An algorithm for the balancing problem, Management Science, 11, 23- 35
- Halgeson W. B., Birnie D. P., 1961. Assembly line balancing using the ranked positional weighting technique, Journal of Industrial Engineering, 12, 18- 27
- Kao, E.P.C., 1976. A preference order dynamic program for stochastic assembly line balancing, Management Science, 22, 19-24
- Lee, T.O., Kim Y., Kim Y.K., 2005. Two-sided assembly line balancing to maximize work relatedness and slackness, Computers & Industrial Engineering, 40, 273-292
- Salveson, M.E., 1955. The assembly line balancing problem, Journal of Industrial Engineering, 62-69
- Scholl, A., 1998. Balancing and sequencing of assembly line, Physica- Verlag
- Sury, R.J., 1971. Aspects of assembly line balancing, International Journal of Production Research, 9, 8-14
Paper Citation
in Harvard Style
Grzechca W. (2008). TWO-SIDED ASSEMBLY LINE - Estimation of Final Results . In Proceedings of the Fifth International Conference on Informatics in Control, Automation and Robotics - Volume 1: ICINCO, ISBN 978-989-8111-30-2, pages 231-237. DOI: 10.5220/0001500102310237
in Bibtex Style
@conference{icinco08,
author={Waldemar Grzechca},
title={TWO-SIDED ASSEMBLY LINE - Estimation of Final Results},
booktitle={Proceedings of the Fifth International Conference on Informatics in Control, Automation and Robotics - Volume 1: ICINCO,},
year={2008},
pages={231-237},
publisher={SciTePress},
organization={INSTICC},
doi={10.5220/0001500102310237},
isbn={978-989-8111-30-2},
}
in EndNote Style
TY - CONF
JO - Proceedings of the Fifth International Conference on Informatics in Control, Automation and Robotics - Volume 1: ICINCO,
TI - TWO-SIDED ASSEMBLY LINE - Estimation of Final Results
SN - 978-989-8111-30-2
AU - Grzechca W.
PY - 2008
SP - 231
EP - 237
DO - 10.5220/0001500102310237