Semi Quantitative Risk Analysis of Onshore Receiving Facility

Patria Wiratama, Yuliusman

2020

Abstract

During the onshore receiving facility (ORF), a potential hazard that could cause an installation failure is found. Onshore receiving facility installation operator needs to do a risk analysis to identify hazards, determine the probability of Failure and consequence of Failure and conduct Semi-quantitative risk analysis due to knowing the risk profile at the onshore receiving facility and the consequence for the environment, people, assets/business, and company reputation. Based on the risk level, the ORF operator can determine a mitigation plan and recommend reducing risks such as inspection frequency, maintenance, and repairs related to internal corrosion and external corrosion. The result of risk analysis states that the overall risk of the ORF installation is at low risk

Download


Paper Citation


in Harvard Style

Wiratama P. and Yuliusman. (2020). Semi Quantitative Risk Analysis of Onshore Receiving Facility. In Proceedings of the 2nd International Conference on Science, Technology, and Environment - Volume 1: ICoSTE, ISBN 978-989-758-545-6, pages 5-11. DOI: 10.5220/0010785600003317


in Bibtex Style

@conference{icoste20,
author={Patria Wiratama and Yuliusman},
title={Semi Quantitative Risk Analysis of Onshore Receiving Facility},
booktitle={Proceedings of the 2nd International Conference on Science, Technology, and Environment - Volume 1: ICoSTE,},
year={2020},
pages={5-11},
publisher={SciTePress},
organization={INSTICC},
doi={10.5220/0010785600003317},
isbn={978-989-758-545-6},
}


in EndNote Style

TY - CONF

JO - Proceedings of the 2nd International Conference on Science, Technology, and Environment - Volume 1: ICoSTE,
TI - Semi Quantitative Risk Analysis of Onshore Receiving Facility
SN - 978-989-758-545-6
AU - Wiratama P.
AU - Yuliusman.
PY - 2020
SP - 5
EP - 11
DO - 10.5220/0010785600003317