Analysis Scheduling XYZ Project using Critical Path Method (CPM) and Program Evaluation and Review Technique (PERT) at PT. NOV Profab

Rohilatul Khazanah, Sri Zuliarni

2021

Abstract

This study aims to test the scheduling of the XYZ project at PT. NOV Profab uses CPM and PERT methods. From this research, we will get the estimation of scheduling time and find the critical path of each method. This study uses data collection techniques by means of direct interviews with the project engineer and documentation data in the form of project schedule attachments. This study was structured with mixed methods. Each method has 3 critical paths, the result of scheduling the CPM method for 52 days, according to the real schedule of the XYZ project and the PERT method for 51 days, faster with the real schedule of the XYZ project.

Download


Paper Citation


in Harvard Style

Khazanah R. and Zuliarni S. (2021). Analysis Scheduling XYZ Project using Critical Path Method (CPM) and Program Evaluation and Review Technique (PERT) at PT. NOV Profab. In Proceedings of the 3rd International Conference on Applied Economics and Social Science - Volume 1: ICAESS, ISBN 978-989-758-605-7, pages 179-183. DOI: 10.5220/0010861200003255


in Bibtex Style

@conference{icaess21,
author={Rohilatul Khazanah and Sri Zuliarni},
title={Analysis Scheduling XYZ Project using Critical Path Method (CPM) and Program Evaluation and Review Technique (PERT) at PT. NOV Profab},
booktitle={Proceedings of the 3rd International Conference on Applied Economics and Social Science - Volume 1: ICAESS,},
year={2021},
pages={179-183},
publisher={SciTePress},
organization={INSTICC},
doi={10.5220/0010861200003255},
isbn={978-989-758-605-7},
}


in EndNote Style

TY - CONF

JO - Proceedings of the 3rd International Conference on Applied Economics and Social Science - Volume 1: ICAESS,
TI - Analysis Scheduling XYZ Project using Critical Path Method (CPM) and Program Evaluation and Review Technique (PERT) at PT. NOV Profab
SN - 978-989-758-605-7
AU - Khazanah R.
AU - Zuliarni S.
PY - 2021
SP - 179
EP - 183
DO - 10.5220/0010861200003255