Optimization of Direct Transportation Flows for the Removal of Construction Waste Bins with both Resource and Task Availability Interval Constraints

Safae Abderebbi, Wahiba Ramdane Cherif-Khettaf

2023

Abstract

This study focuses on a new real-word problem encountered in the construction sector, which concerns the optimization of the removal of construction waste bins from construction sites to a massification platform, where a limited heterogeneous fleet of tipper trucks (vehicles) must perform direct trips from the platform to the construction sites to collect the waste bins. Each vehicle has a capacity of one bin, it leaves the platform with an empty bin, travels to the construction site, drops off the empty bin in the construction site, collects the full bin and returns to the platform to unload the full bin. The issue is that the vehicles and the construction sites have one or more periods of availability, and thus are not available any time. This problem is modeled as a parallel machine scheduling problem of bin removal tasks on non-identical machines (vehicles), with new constraints that concern the presence of multiple availability intervals for both vehicles and tasks. Two mixed-integer programming (MIP) models are presented and evaluated on 18 new instances derived from real industrial case study.

Download


Paper Citation


in Harvard Style

Abderebbi S. and Ramdane Cherif-Khettaf W. (2023). Optimization of Direct Transportation Flows for the Removal of Construction Waste Bins with both Resource and Task Availability Interval Constraints. In Proceedings of the 12th International Conference on Operations Research and Enterprise Systems - Volume 1: ICORES, ISBN 978-989-758-627-9, pages 221-228. DOI: 10.5220/0011821900003396


in Bibtex Style

@conference{icores23,
author={Safae Abderebbi and Wahiba Ramdane Cherif-Khettaf},
title={Optimization of Direct Transportation Flows for the Removal of Construction Waste Bins with both Resource and Task Availability Interval Constraints},
booktitle={Proceedings of the 12th International Conference on Operations Research and Enterprise Systems - Volume 1: ICORES,},
year={2023},
pages={221-228},
publisher={SciTePress},
organization={INSTICC},
doi={10.5220/0011821900003396},
isbn={978-989-758-627-9},
}


in EndNote Style

TY - CONF

JO - Proceedings of the 12th International Conference on Operations Research and Enterprise Systems - Volume 1: ICORES,
TI - Optimization of Direct Transportation Flows for the Removal of Construction Waste Bins with both Resource and Task Availability Interval Constraints
SN - 978-989-758-627-9
AU - Abderebbi S.
AU - Ramdane Cherif-Khettaf W.
PY - 2023
SP - 221
EP - 228
DO - 10.5220/0011821900003396