Productivity Analysis of Heavy Equipment in the Nglurup Pond Project, Tulungagung Regency East Java Examined from Time and Cost Analysis

Siti Choiriyah, Felicia Nuciferani, Theresia Agusdini, Dewi Kusumaningrum, Yoga Ilham

2023

Abstract

The construction of the Reservoir Nglurup in Tulungagung District has a length of 50 meters, this is used to store water when it rains and can be stored for use during the summer. The process of excavating the body of the reservoir uses heavy equipment to support dewatering work at the work site, excavating soil and removing soil. The large number of heavy equipment operating at the location limits the ability of heavy equipment to move, so it is necessary to plan the position of the heavy equipment in order to facilitate the work. The research method was carried out by observing in the field. The excavation work for the reservoir body took 19 working days with a total heavy equipment operational cost of IDR 270,000,000. While the planning calculation for 14 days with the total operational cost of heavy equipment amounted to IDR 382,889,800. The results of calculating operator efficiency in terms of Availability Index, Physical Availability, Use of Ability, Effective Utilization show how the operator’s work is planned better than operators in the field.

Download


Paper Citation


in Harvard Style

Choiriyah S., Nuciferani F., Agusdini T., Kusumaningrum D. and Ilham Y. (2023). Productivity Analysis of Heavy Equipment in the Nglurup Pond Project, Tulungagung Regency East Java Examined from Time and Cost Analysis. In Proceedings of the 4th International Conference on Advanced Engineering and Technology - Volume 1: ICATECH; ISBN 978-989-758-663-7, SciTePress, pages 348-353. DOI: 10.5220/0012109600003680


in Bibtex Style

@conference{icatech23,
author={Siti Choiriyah and Felicia Nuciferani and Theresia Agusdini and Dewi Kusumaningrum and Yoga Ilham},
title={Productivity Analysis of Heavy Equipment in the Nglurup Pond Project, Tulungagung Regency East Java Examined from Time and Cost Analysis},
booktitle={Proceedings of the 4th International Conference on Advanced Engineering and Technology - Volume 1: ICATECH},
year={2023},
pages={348-353},
publisher={SciTePress},
organization={INSTICC},
doi={10.5220/0012109600003680},
isbn={978-989-758-663-7},
}


in EndNote Style

TY - CONF

JO - Proceedings of the 4th International Conference on Advanced Engineering and Technology - Volume 1: ICATECH
TI - Productivity Analysis of Heavy Equipment in the Nglurup Pond Project, Tulungagung Regency East Java Examined from Time and Cost Analysis
SN - 978-989-758-663-7
AU - Choiriyah S.
AU - Nuciferani F.
AU - Agusdini T.
AU - Kusumaningrum D.
AU - Ilham Y.
PY - 2023
SP - 348
EP - 353
DO - 10.5220/0012109600003680
PB - SciTePress